Back To Insights

Getting ready to demonstrate operational resilience by 31 March 2025

Downloadable Documents

The three-year transitional period for implementing PRA and/or FCA operational resilience requirements ends on 31 March 2025. 31 March 2025 is a hard deadline.

From 1 April 2025, at the latest, the PRA and the FCA will expect you to be able to demonstrate you are operationally resilient, i.e. for each of your identified important business services (IBS) you are satisfied that in the event of a severe but plausible disruption, you can remain within the impact tolerances your board agreed as their maximum tolerable period of disruption for these services.

Share: